Prefabricated Modular Cabin / Skid Solution

Prefabricated Modular Cabin / Skid Solution

Integrate equipment, structure, piping, electrical, HVAC, and controls into deployable engineered units

Solution Overview

Based on the project single-line diagram, equipment list, environmental conditions, and site hook-up requirements, Taybo factory-prefab integrates equipment, structure, piping, electrical, controls, and auxiliaries into clearly bounded, inspected, and tested modular cabins or

Can integrate transformers, MV/LV switchgear, UPS, batteries, ATS/STS, MCC, busway, cabling, protection/controls, and auxiliaries into a PTU / Power Block, MV switch station, or prefabricated substation

Power module cabin

Power module cabin

Configured flexibly by system function and transport envelope

Reduce site uncertainty and raise module delivery quality

Prefabricated modules move complex installation into a more stable, quality-controlled factory environment—reducing on-site alignment, welding, piping, wiring, and commissioning work. By freezing structural, electrical, piping, and control interfaces early, projects lower multi-trade coordination risk and support standardized replication, phased build-out, and multi-site deployment with common capacity units.

Reduce site uncertainty and raise module delivery quality

End-to-end delivery path from interface freeze to site commissioning

Define project boundaries

Confirm single-line diagrams, equipment scope, site conditions, transport limits, local

Engineering design & BIM detailing

Coordinate structure, electrical, HVAC, piping, and control interfaces; detail the design for manufacturing, transport, installation, and maintenance

Supply chain & production planning

Coordinate equipment procurement, structural fabrication, piping prefabrication, electrical installation, and system integration; manage critical equipment and module interfaces

Factory integration

Complete equipment placement, piping connections, busway and cable installation, control wiring, and auxiliary fit-out

Factory testing

Per approved plans, perform structural, electric

Transport

Support packaging, transport, lifting, and site hook-up, plus inspection, SAT, and system commissioning

For projects that need rapid deployment and standardized replication

New data center campuses, AI high-density facilities, schedule-critical projects, sites with limited construction resources, overseas and cross-region deliveries, phased builds, and projects that need the same infrastructure architecture replicated across multiple sites.

Data Center Design Services

Multidiscipline engineering and construction documentation

Individual service packages or a combined design scope

Data Center Design Services

Design Deliverables & Review Stages

Documents for system design, equipment selection and construction coordination

Service packageTypical deliverables
Design basisBasis of Design, drawing register and main equipment BOQs
Electrical powerLoad / cable calculations, schematics, layouts and details
Mechanical & coolingEquipment / hydraulic calculations, schematics, layouts and details
Fire protectionGas suppression calculations, alarm and suppression drawings
ELV, ICT & BMSNetwork / security drawings, BMS point lists and port schedules
Fit-out & foundationsPlans, elevations, installation details and equipment foundation plans

Optional: Data hall airflow CFD reportIFC = Issued for Construction. Final scope and delivery formats follow the project agreement.

Design stages

Design review at each submission stage

  1. BOD

    MEP design basis and drawing register

  2. 30%

    Initial drawings, calculations and equipment BOQ

  3. 60%

    Developed drawings and updated equipment BOQ

  4. 100% / IFC

    Final drawings and updated equipment BOQ