Data Center Liquid Cooling Solutions

Data Center Liquid Cooling Solutions

From the cooling source to rack connections, we build integrated liquid cooling systems designed to maintain coolant cleanliness and support future expansion.

Solution Overview

Taybo designs and integrates liquid cooling systems for AI and high-density computing workloads. Built around modular cooling plants, CDUs, secondary-side distribution piping and rack interfaces, these systems bring cooling supply, heat exchange, circulation, controls, leak detection and water quality management into a coordinated design. Factory prefabrication, interface management, testing and validation help reduce deployment risks associated with leaks, contamination, material incompatibility and on-site connections. This approach provides thermal management infrastructure that can expand in phases to support IT workloads with high power densities.

Integrated Thermal Management from Cooling Source to Chip

Cooling Plant

Cooling Plant

We select and configure chillers, dry coolers or hybrid cooling systems to suit the site’s climate, energy efficiency targets, redundancy requirements and operating strategy, providing a stable cooling supply for the liquid cooling system.

What needs to be confirmed before designing a liquid cooling system?

Key inputs include total IT heat load, rack power density, coolant supply and return temperatures, design flow rate, system differential pressure, coolant type, material compatibility, and particulate cleanliness and water quality standards. Redundancy requirements, control protocols, UQD/quick-disconnect couplings, leak detection methods, maintenance clearances and drainage arrangements also need to be confirmed, along with primary-side cooling source and site piping conditions. These inputs directly influence CDU capacity, pump set selection, pipe diameters, manifold configuration, filtration ratings, control strategy and how the system is divided into modules.

What needs to be confirmed before designing a liquid cooling system?

Verify System Integrity and Cleanliness Before Delivery

Pressure and Leak Checks

Verifies the pressure integrity and leak-tightness of piping, valves, equipment and connections.

Flow Resistance and Pressure Drop Checks

Checks system flow paths and pressure drop against design requirements.

Flushing and Cleanliness Control

We carry out flushing, passivation, and water quality or particulate cleanliness checks as required by the project, with protective sealing and packaging for delivery.

Instrumentation and Control Checks

Checks sensors, controllers, communication interfaces, alarms and operating logic.

Leak Detection and Interlock Verification

Verifies leak detection, alarm functions and the system interlocks agreed for the project.

Commissioning & Heat Load Testing

Taybo provides commissioning and heat load testing for liquid-cooled data halls so cooling performance is proven before full IT load arrives. Factory and site heat load banks: Portable or skid-mounted heat load banks simulate rack and CDU thermal load at the factory or on site. Validate heat rejection, approach temperatures, and control response under staged load steps without waiting for production IT equipment. CDU loop validation: Confirm primary and secondary CDU loops for flow, differential pressure, supply/return temperatures, filtration, and control setpoints. Verify redundancy switchover, alarm limits, and leak-detection interlocks against the project sequence of operations. Thermal commissioning for liquid-cooled halls: Execute hall-level thermal commissioning across CDUs, secondary distribution, and rack interfaces. Document stable operation under design heat load, tune controls for efficiency and safety margins, and hand over clear test records for operations teams. Factory interface readiness supports this path: BIM, equipment lists, interface matrices, and numbered prefabricated pipe sections integrate CDUs, pump sets, filtration, manifolds, valves, instrumentation, and secondary piping so modules connect on arrival with clearly defined interfaces—reducing site uncertainty before heat load testing begins.

Commissioning & Heat Load Testing

Designed for High-Density Computing and Liquid Cooling Upgrades

AI data centers, high-performance computing centers, data halls with high power densities, cold plate liquid cooling projects, hybrid air and liquid cooling projects, liquid cooling retrofits for existing data centers, and projects requiring phased deployment and rapid expansion of liquid cooling capacity.

Data Center Design Services

Multidiscipline engineering and construction documentation

Individual service packages or a combined design scope

Data Center Design Services

Design Deliverables & Review Stages

Documents for system design, equipment selection and construction coordination

Service packageTypical deliverables
Design basisBasis of Design, drawing register and main equipment BOQs
Electrical powerLoad / cable calculations, schematics, layouts and details
Mechanical & coolingEquipment / hydraulic calculations, schematics, layouts and details
Fire protectionGas suppression calculations, alarm and suppression drawings
ELV, ICT & BMSNetwork / security drawings, BMS point lists and port schedules
Fit-out & foundationsPlans, elevations, installation details and equipment foundation plans

Optional: Data hall airflow CFD reportIFC = Issued for Construction. Final scope and delivery formats follow the project agreement.

Design stages

Design review at each submission stage

  1. BOD

    MEP design basis and drawing register

  2. 30%

    Initial drawings, calculations and equipment BOQ

  3. 60%

    Developed drawings and updated equipment BOQ

  4. 100% / IFC

    Final drawings and updated equipment BOQ